Designed for high-demand African infrastructure, mining support, and municipal water logistics, the CLW5250GSSZ3 combines a Sinotruk HOWO ZZ1257N4641W 6x4 truck chassis with a 20 m³ (20,000 L) elliptical water tank. Its 336 hp (250.6 kW) WD615.69 inline-six diesel engine, HW19710 manual gearbox, and tandem rear drive axles give operators reliable traction when carrying a full 20-ton water payload along graded quarry routes, highway construction corridors, and peri-urban supply lines.
Integrated Tank and Spraying Architecture
The upper body is fabricated from 5 mm Q235B carbon steel and fitted with three internal anti-wave baffle plates to dampen liquid surge during braking and cornering on uneven roads. A top-mounted DN500 mm press-type manhole and rear access ladder simplify inspection and washout. Powered through the chassis PTO, the self-priming centrifugal water pump draws directly from rivers, boreholes, or reservoirs at suction depths exceeding 6 meters, reducing turnaround time where pressurized hydrants are unavailable.
Practical Multi-Duty Field Workflow
- Road Washing & Dust Suppression: Front flushing nozzles, rear spray bars, and side sprinklers cover road widths above 14 meters in a single pass.
- Targeted Jetting & Greening: A rear working platform carries an adjustable high-pressure water cannon with over 28 meters of reach, shifting smoothly from straight jet to heavy, moderate, or fine drizzle patterns.
- Flexible Transfer: Fire-valve couplings, self-flow outlets, multi-way ball valves, and an onboard 7-meter hose support gravity unloading or emergency fire-suppression backup.
Fleet Configuration and Order Flexibility
Available in both left-hand drive and right-hand drive layouts, this 20 m³ bowser adapts cleanly to West, East, Central, and Southern African traffic rules. Fleet buyers can specify optional internal anti-corrosion linings or stainless steel tank construction for potable water contracts. Tiered unit pricing rewards multi-truck procurement, and large project orders can be scheduled for phased batch delivery to align with site mobilization timelines.