Combined Tank Partitioning
8–10 m³ sewage + 4–5 m³ clean water (10–15 m³ total)
Enables a single crew to flush clogged pipes and extract dislodged slurry on the same trip, reducing back-and-forth depot shuttles during urban shifts.
- Operating conditions
- Assumes balanced municipal maintenance cycles where 30–35% water volume is sufficient to break up silt before vacuum extraction.
- What affects the result
- Actual usable load per trip varies with sludge density, local axle-load limits, and whether water is topped up from hydrants on site.




